1. Select Strategies from the Main Menu and select the strategy where you want to create the new Key Result:
2. Click the Option Button (three dots) for the Objective you want to connect a new Key Result to.
3. Select New Key Result:
4. Enter the required information, starting with the name of the Key Result. If needed add a description of your Key Result in the Description field.
5. Optional: Choose an Accountable user and a Sponsor user.
6. Choose a Responsible Unit. By default, the system will assign this to the root organizational unit.
7. Enable the Link Strategy if you want to link this strategy to an other strategy. Read more about how to link strategies here.
8. Save the new Key Result.